Technical Working Groups (TWG)

Aquatic... | WBMS | Cultural | Land Use | Recreation/Aesthetics | Socioeconomics | Terrestrial

2001  2002  2003  2004  2005 

Date Title
12/15/2003 TWG Terrestrial Resources Meeting - - Time & Place
12/12/2003 TWG Socioeconomics Meeting - - Time & Place
12/10/2003 TWG Recreational Resources and Aesthetics Meeting - (1) Review the results of the Recreational Flow Study (Downstream Reach below Chili Bar Dam) - morning; (2) Review and Approve Iowa Hill Visual Resources Study Plan - 1:00 PM - - Time & Place
12/8/2003 Water Balance Model Subcommittee Meeting - - Time & Place
12/4/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
12/1/2003 TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - CANCELLED - - Time & Place
11/21/2003 TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - CANCELLED - - Time & Place
11/14/2003 TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - - Time & Place
11/13/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Iowa Hill - - Time & Place
11/12/2003 TWG Recreational Resources and Aesthetics Meeting - Visitor Use and Impact Study Results - - Time & Place
11/12/2003 TWG Socioeconomics Meeting - Socioecomonics Impact Study (Presentation), Reoperation Study (Status) - - Time & Place
11/10/2003 Water Balance Model Subcommittee Meeting - - Time & Place
11/6/2003 Water Balance Model Subcommittee Meeting - - Time & Place
11/6/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
11/3/2003 TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - CANCELLED - - Time & Place
10/27/2003 TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - - Time & Place
10/23/2003 TWG Terrestrial Resources Meeting - - Time & Place
10/22/2003 TWG Socioeconomics Meeting - CANCELLED - - Time & Place
10/22/2003 TWG Recreational Resources and Aesthetics Meeting - Carrying Capacity Study Results - - Time & Place
10/14/2003 TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - - Time & Place
10/9/2003 Water Balance Model Subcommittee Meeting - - Time & Place
10/8/2003 Water Balance Model Subcommittee Meeting - - Time & Place
10/2/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - HCS Discussion and Approval of Curves - - Time & Place
9/29/2003 TWG Recreational Resources and Aesthetics Internal Focus Group Meeting - - Time & Place
9/26/2003 TWG Socioeconomics Meeting - Socioeconomic Evaluation for the Reach Downstream of Chili Bar Dam - - Time & Place
9/26/2003 TWG Recreational Resources and Aesthetics Meeting - Presentation of Carol E's Results of the Recreation Flow Study (Reach Downstream of Chili Bar Dam) - CANCELLED - - Time & Place
9/24/2003 TWG Recreational Resources and Aesthetics Meeting - Visitor Use and Impact Study Results - CANCELLED - - Time & Place
9/23/2003 Water Balance Model Subcommittee Meeting - - Time & Place
9/19/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
9/16/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Site Visit to Brush Creek for PHABSIM Transect Selection - - Time & Place
9/15/2003 TWG Recreational Resources and Aesthetics Internal Focus Group Meeting - - Time & Place
9/10/2003 TWG Recreational Resources and Aesthetics Meeting - Recreation Flow Downstream of Chili Bar Dam Study Results - CANCELLED - - Time & Place
9/10/2003 TWG Socioeconomics Meeting - CANCELLED - - Time & Place
9/8/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Chili Bar Instream Flow/Water Level Fluctuation, White Water Boating Study - - Time & Place
9/4/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Fish Passage & Deepwater Entrainment Study Plans - - Time & Place
9/3/2003 Water Balance Model Subcommittee Meeting - CANCELLED - - Time & Place
8/27/2003 TWG Recreational Resources and Aesthetics Meeting - Whitewater Boating Feasibility - Part 2 Study Results - - Time & Place
8/26/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Test Flow Study Plan Specialists Meeting - - Time & Place
8/22/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
8/21/2003 TWG Recreational Resources and Aesthetics Meeting - Carrying Capacity Study Methodology - - Time & Place
8/21/2003 TWG Terrestrial Resources Meeting - Present Status of Terrestrial Study Plans to Date & Field Work Information - CANCELLED - - Time & Place
8/20/2003 TWG Cultural Resources Meeting - UARP Tour - - Time & Place
8/20/2003 Water Balance Model Subcommittee Meeting - - Time & Place
8/19/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Recreation Boating Flows and Biological Considerations - - Time & Place
8/13/2003 TWG Recreational Resources and Aesthetics Meeting - Carrying Capacity - Excluding Whitewater Boating - Study Results - CANCELLED - - Time & Place
8/7/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Chili Bar Flow and Fluctuation Study Plan - CANCELLED - - Time & Place
8/1/2003 TWG Land Use Meeting - - Time & Place
7/31/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
7/28/2003 Water Balance Model Subcommittee Meeting - - Time & Place
7/23/2003 TWG Recreational Resources and Aesthetics Meeting - Supply for all other Recreation Opportunities Study Results - - Time & Place
7/15/2003 Water Balance Model Subcommittee Meeting - - Time & Place
7/14/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
7/9/2003 TWG Recreational Resources and Aesthetics Meeting - Supply for Whitewater Boating Study Results and Whitewater Boating Feasibility - Part 1 Study Results - CANCELLED - - Time & Place
7/2/2003 TWG Cultural Resources Meeting - - Time & Place
6/30/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
6/25/2003 Water Balance Model Subcommittee Meeting - - Time & Place
6/25/2003 TWG Recreational Resources and Aesthetics Meeting - Demand Study Results - - Time & Place
6/5/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - CANCELLED - - Time & Place
5/29/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Discussion of Need for Subsequent Fish Sampling (Follow-up Item from March 6, 2003 Aquatic TWG Meeting - - Time & Place
5/28/2003 TWG Recreational Resources and Aesthetics Meeting - Recreation Flow-Downstream Reach below Chili Bar Dam - - Time & Place
5/22/2003 TWG Land Use Meeting - - Time & Place
5/20/2003 Water Balance Model Subcommittee Meeting - - Time & Place
5/14/2003 TWG Recreational Resources and Aesthetics Internal Focus Group Meeting - - Time & Place
5/13/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Presentation of Study Results of 2002 for 1) Aquatic Bioassessment - - Time & Place
5/5/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Continued Discussion of Habitat Suitability Criteria (HSC) - - Time & Place
5/1/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Presentation of Study Results of 2002 for 1) Deep Water Entrainment and 2) Discussion of Water Temperature Modeling Needs - - Time & Place
4/30/2003 TWG Cultural Resources Meeting - - Time & Place
4/28/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Site Visit: Brush Creek Reservoir Dam Reach to Discuss Consideration of Reach for PHABSIM - - Time & Place
4/23/2003 TWG Recreational Resources and Aesthetics Meeting - - Time & Place
4/22/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow and Presentation of Study Results of 2002 for 1) Water Quality and Water Temperature - - Time & Place
4/21/2003 TWG Recreational Resources and Aesthetics Internal Focus Group Meeting - - Time & Place
4/18/2003 Water Balance Model Subcommittee Meeting - - Time & Place
4/14/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Chili Bar Meeting: Chili Bar - Continued Discussion of Draft Instream Flow and Fluctuation Study Plan (for the Reach Downstream of Chili Bar Dam) - - Time & Place
4/9/2003 TWG Recreational Resources and Aesthetics Meeting - CANCELLED - - Time & Place
4/9/2003 TWG Recreational Resources and Aesthetics Internal Focus Group Meeting - - Time & Place
4/4/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Site Visit: Gerle Creek Dam Diversion and Canal to Discuss Draft Shallow Water Entrainment Study Plan - CANCELLED - - Time & Place
4/3/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Presentation of Study Results of 2002 for 1) Hydrology and 2) Spill Assessment - - Time & Place
4/1/2003 Water Balance Model Subcommittee Meeting - - Time & Place
3/26/2003 TWG Recreational Resources and Aesthetics Meeting - - Time & Place
3/19/2003 TWG Terrestrial Resources Meeting - CANCELLED - - Time & Place
3/18/2003 TWG Terrestrial Resources Meeting - - Time & Place
3/17/2003 TWG Land Use Meeting - - Time & Place
3/17/2003 TWG Socioeconomics Meeting - - Time & Place
3/14/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Chili Bar Meeting: Chili Bar - Continued Discussion of Draft Instream Flow and Fluctuation Study Plan (for the Reach Downstream of Chili Bar Dam) - - Time & Place
3/12/2003 TWG Recreational Resources and Aesthetics Meeting - CANCELLED - - Time & Place
3/6/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Presentation of Study Results of 2002 for 1) Stream Habitat; 2) Stream Fisheries; 3) Reservoir Habitat; and 4) Reservoir Fisheries - - Time & Place
3/4/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow - - Time & Place
3/3/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow - - Time & Place
2/27/2003 TWG Cultural Resources Meeting - - Time & Place
2/26/2003 TWG Recreational Resources and Aesthetics Meeting - - Time & Place
2/21/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
2/13/2003 TWG Land Use Meeting - - Time & Place
2/12/2003 TWG Recreational Resources and Aesthetics Meeting CANCELLED - - Time & Place
2/6/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
2/5/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
2/5/2003 TWG Recreational Resources and Aesthetics Meeting - - Time & Place
2/4/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow - - Time & Place
2/3/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow - - Time & Place
1/22/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
1/22/2003 TWG Recreational Resources and Aesthetics Meeting - - Time & Place
1/16/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Chili Bar - - Time & Place
1/15/2003 TWG Socioeconomics Meeting CANCELLED - - Time & Place
1/15/2003 TWG Land Use Meeting - - Time & Place
1/9/2003 TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - - Time & Place
1/8/2003 TWG Recreational Resources and Aesthetics Meeting - - Time & Place

The Technical Working Groups were made up of representatives of the interested parties and addressed specific resource issues, such as fishery resources, recreation, and cultural resources. The purpose and function of the Technical Working Groups was further defined in the final Communication and Process Protocols adopted by the Plenary Group. 

The Technical Working Groups were self-governing, by consensus, and responsibilities of each Technical Working Group included: 

  • Establishing rules, procedures, and a schedule within the overarching structure and schedule established by the Plenary Group;
  • Developing study plans and methodologies for the resource issues assigned to it by the Plenary Group; and
  • Developing PM&E measures for the resource issues assigned to it by the Plenary Group once studies have been conducted.

Third-Party Facilitator

Technical Working Groups could also choose to use the third-party facilitator. The third-party facilitator could ensure that all group Participants had an opportunity to be heard, that the meetings were productive and efficient, and that meeting summaries were prepared. The third-party facilitator were selected and paid for by SMUD. However, the third-party facilitator sought to further the interests of all Participants, not just the interests of SMUD.

Decision-Making

Participants sought agreement on studies needed, study methodologies, appropriate PM&E measures, and other issues. Decisions were made by consensus among the Participants at scheduled Plenary Group or Technical Working Group meetings. Consensus means that all Participants to a given decision can "live with" the decision. Absent specific language to the contrary, the agreements reached by the Plenary Group or Technical Working Group Participants are not intended to create contractual obligations. However, the success of this relicensing depends on all Participants acting in good faith, and it is expected that when a Participant indicates agreement to a decision, the other Participants can rely on that Participant to support such decision within its own organization and throughout the licensing process.

In making decisions and reaching agreements, the Plenary Group or Technical Working Group Participants used the entire record of information available, including public input, existing sources of information and the results of the studies conducted by SMUD.

Dispute Resolution

Participants in the Plenary Group and Technical Working Groups made good faith attempts to reach agreements, as described in "Decision Making." If consensus regarding a particular issue was not achieved after reasonable efforts, the issue was considered to be in dispute. When a Technical Working Group issue was in dispute, the dispute was referred to the Plenary Group. When the Plenary Group had an issue in dispute, initial attempts at resolution occurred as internal focus groups meeting separately, with the facilitator if needed. If internal forms of dispute resolution failed, the Participants could have arranged for a FERC facilitator/mediator or a third-party facilitator/mediator, if the Participants determined that such action would help resolve the dispute. In disputes on PM&E measures not resolved by the time SMUD submitted its license application to FERC, the preliminary draft EA prepared by SMUD presented the disputed PM&E measures in the form of alternative measures.

Technical Working Group meetings were open to the public.