| Date |
Title |
|
12/15/2003 |
TWG Terrestrial Resources Meeting
- - Time & Place |
|
12/12/2003 |
TWG Socioeconomics Meeting
- - Time & Place |
|
12/10/2003 |
TWG Recreational Resources and Aesthetics Meeting - (1) Review the results of the Recreational Flow Study (Downstream Reach below Chili Bar Dam) - morning; (2) Review and Approve Iowa Hill Visual Resources Study Plan - 1:00 PM
- - Time & Place |
|
12/8/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
12/4/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
12/1/2003 |
TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - CANCELLED
- - Time & Place |
|
11/21/2003 |
TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - CANCELLED
- - Time & Place |
|
11/14/2003 |
TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting
- - Time & Place |
|
11/13/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Iowa Hill
- - Time & Place |
|
11/12/2003 |
TWG Recreational Resources and Aesthetics Meeting - Visitor Use and Impact Study Results
- - Time & Place |
|
11/12/2003 |
TWG Socioeconomics Meeting - Socioecomonics Impact Study (Presentation), Reoperation Study (Status)
- - Time & Place |
|
11/10/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
11/6/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
11/6/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
11/3/2003 |
TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting - CANCELLED
- - Time & Place |
|
10/27/2003 |
TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting
- - Time & Place |
|
10/23/2003 |
TWG Terrestrial Resources Meeting
- - Time & Place |
|
10/22/2003 |
TWG Socioeconomics Meeting - CANCELLED
- - Time & Place |
|
10/22/2003 |
TWG Recreational Resources and Aesthetics Meeting - Carrying Capacity Study Results
- - Time & Place |
|
10/14/2003 |
TWG Recreational Resources and Aesthetics IFG Internal Focus Group Meeting
- - Time & Place |
|
10/9/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
10/8/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
10/2/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - HCS Discussion and Approval of Curves
- - Time & Place |
|
9/29/2003 |
TWG Recreational Resources and Aesthetics Internal Focus Group Meeting
- - Time & Place |
|
9/26/2003 |
TWG Socioeconomics Meeting - Socioeconomic Evaluation for the Reach Downstream of Chili Bar Dam
- - Time & Place |
|
9/26/2003 |
TWG Recreational Resources and Aesthetics Meeting - Presentation of Carol E's Results of the Recreation Flow Study (Reach Downstream of Chili Bar Dam) - CANCELLED
- - Time & Place |
|
9/24/2003 |
TWG Recreational Resources and Aesthetics Meeting - Visitor Use and Impact Study Results - CANCELLED
- - Time & Place |
|
9/23/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
9/19/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
9/16/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Site Visit to Brush Creek for PHABSIM Transect Selection
- - Time & Place |
|
9/15/2003 |
TWG Recreational Resources and Aesthetics Internal Focus Group Meeting
- - Time & Place |
|
9/10/2003 |
TWG Recreational Resources and Aesthetics Meeting - Recreation Flow Downstream of Chili Bar Dam Study Results - CANCELLED
- - Time & Place |
|
9/10/2003 |
TWG Socioeconomics Meeting - CANCELLED
- - Time & Place |
|
9/8/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Chili Bar Instream Flow/Water Level Fluctuation, White Water Boating Study
- - Time & Place |
|
9/4/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Fish Passage & Deepwater Entrainment Study Plans
- - Time & Place |
|
9/3/2003 |
Water Balance Model Subcommittee Meeting - CANCELLED
- - Time & Place |
|
8/27/2003 |
TWG Recreational Resources and Aesthetics Meeting - Whitewater Boating Feasibility - Part 2 Study Results
- - Time & Place |
|
8/26/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Test Flow Study Plan Specialists Meeting
- - Time & Place |
|
8/22/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
8/21/2003 |
TWG Recreational Resources and Aesthetics Meeting - Carrying Capacity Study Methodology
- - Time & Place |
|
8/21/2003 |
TWG Terrestrial Resources Meeting - Present Status of Terrestrial Study Plans to Date & Field Work Information - CANCELLED
- - Time & Place |
|
8/20/2003 |
TWG Cultural Resources Meeting - UARP Tour
- - Time & Place |
|
8/20/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
8/19/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Recreation Boating Flows and Biological Considerations
- - Time & Place |
|
8/13/2003 |
TWG Recreational Resources and Aesthetics Meeting - Carrying Capacity - Excluding Whitewater Boating - Study Results - CANCELLED
- - Time & Place |
|
8/7/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - Chili Bar Flow and Fluctuation Study Plan - CANCELLED
- - Time & Place |
|
8/1/2003 |
TWG Land Use Meeting
- - Time & Place |
|
7/31/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
7/28/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
7/23/2003 |
TWG Recreational Resources and Aesthetics Meeting - Supply for all other Recreation Opportunities Study Results
- - Time & Place |
|
7/15/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
7/14/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
7/9/2003 |
TWG Recreational Resources and Aesthetics Meeting - Supply for Whitewater Boating Study Results and Whitewater Boating Feasibility - Part 1 Study Results - CANCELLED
- - Time & Place |
|
7/2/2003 |
TWG Cultural Resources Meeting
- - Time & Place |
|
6/30/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
6/25/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
6/25/2003 |
TWG Recreational Resources and Aesthetics Meeting - Demand Study Results
- - Time & Place |
|
6/5/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting - CANCELLED
- - Time & Place |
|
5/29/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Discussion of Need for Subsequent Fish Sampling (Follow-up Item from March 6, 2003 Aquatic TWG Meeting
- - Time & Place |
|
5/28/2003 |
TWG Recreational Resources and Aesthetics Meeting - Recreation Flow-Downstream Reach below Chili Bar Dam
- - Time & Place |
|
5/22/2003 |
TWG Land Use Meeting
- - Time & Place |
|
5/20/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
5/14/2003 |
TWG Recreational Resources and Aesthetics Internal Focus Group Meeting
- - Time & Place |
|
5/13/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Presentation of Study Results of 2002 for 1) Aquatic Bioassessment
- - Time & Place |
|
5/5/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Continued Discussion of Habitat Suitability Criteria (HSC)
- - Time & Place |
|
5/1/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Presentation of Study Results of 2002 for 1) Deep Water Entrainment and 2) Discussion of Water Temperature Modeling Needs
- - Time & Place |
|
4/30/2003 |
TWG Cultural Resources Meeting
- - Time & Place |
|
4/28/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Site Visit: Brush Creek Reservoir Dam Reach to Discuss Consideration of Reach for PHABSIM
- - Time & Place |
|
4/23/2003 |
TWG Recreational Resources and Aesthetics Meeting
- - Time & Place |
|
4/22/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow and Presentation of Study Results of 2002 for 1) Water Quality and Water Temperature
- - Time & Place |
|
4/21/2003 |
TWG Recreational Resources and Aesthetics Internal Focus Group Meeting
- - Time & Place |
|
4/18/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
4/14/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Chili Bar Meeting: Chili Bar - Continued Discussion of Draft Instream Flow and Fluctuation Study Plan (for the Reach Downstream of Chili Bar Dam)
- - Time & Place |
|
4/9/2003 |
TWG Recreational Resources and Aesthetics Meeting - CANCELLED
- - Time & Place |
|
4/9/2003 |
TWG Recreational Resources and Aesthetics Internal Focus Group Meeting
- - Time & Place |
|
4/4/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Site Visit: Gerle Creek Dam Diversion and Canal to Discuss Draft Shallow Water Entrainment Study Plan - CANCELLED
- - Time & Place |
|
4/3/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Presentation of Study Results of 2002 for 1) Hydrology and 2) Spill Assessment
- - Time & Place |
|
4/1/2003 |
Water Balance Model Subcommittee Meeting
- - Time & Place |
|
3/26/2003 |
TWG Recreational Resources and Aesthetics Meeting
- - Time & Place |
|
3/19/2003 |
TWG Terrestrial Resources Meeting - CANCELLED
- - Time & Place |
|
3/18/2003 |
TWG Terrestrial Resources Meeting
- - Time & Place |
|
3/17/2003 |
TWG Land Use Meeting
- - Time & Place |
|
3/17/2003 |
TWG Socioeconomics Meeting
- - Time & Place |
|
3/14/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Chili Bar Meeting: Chili Bar - Continued Discussion of Draft Instream Flow and Fluctuation Study Plan (for the Reach Downstream of Chili Bar Dam)
- - Time & Place |
|
3/12/2003 |
TWG Recreational Resources and Aesthetics Meeting - CANCELLED
- - Time & Place |
|
3/6/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Presentation of Study Results of 2002 for 1) Stream Habitat; 2) Stream Fisheries; 3) Reservoir Habitat; and 4) Reservoir Fisheries
- - Time & Place |
|
3/4/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow
- - Time & Place |
|
3/3/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow
- - Time & Place |
|
2/27/2003 |
TWG Cultural Resources Meeting
- - Time & Place |
|
2/26/2003 |
TWG Recreational Resources and Aesthetics Meeting
- - Time & Place |
|
2/21/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
2/13/2003 |
TWG Land Use Meeting
- - Time & Place |
|
2/12/2003 |
TWG Recreational Resources and Aesthetics Meeting CANCELLED
- - Time & Place |
|
2/6/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
2/5/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
2/5/2003 |
TWG Recreational Resources and Aesthetics Meeting
- - Time & Place |
|
2/4/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow
- - Time & Place |
|
2/3/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Instream Flow
- - Time & Place |
|
1/22/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
1/22/2003 |
TWG Recreational Resources and Aesthetics Meeting
- - Time & Place |
|
1/16/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting: Chili Bar
- - Time & Place |
|
1/15/2003 |
TWG Socioeconomics Meeting CANCELLED
- - Time & Place |
|
1/15/2003 |
TWG Land Use Meeting
- - Time & Place |
|
1/9/2003 |
TWG Aquatic, Water Quality, Geomorphology & Hydrology Resources Meeting
- - Time & Place |
|
1/8/2003 |
TWG Recreational Resources and Aesthetics Meeting
- - Time & Place |
The Technical Working Groups were made up of representatives of the
interested parties and addressed specific resource issues, such as
fishery resources, recreation, and cultural resources. The purpose and
function of the Technical Working Groups was further defined in the
final Communication and Process Protocols adopted by the Plenary
Group.
The Technical Working Groups were self-governing, by consensus, and responsibilities of each Technical
Working Group included:
- Establishing rules, procedures, and a schedule within the overarching
structure and schedule established by the Plenary Group;
- Developing study plans and methodologies for the resource issues
assigned to it by the Plenary Group; and
- Developing PM&E measures for the resource issues assigned to it by the
Plenary Group once studies have been conducted.
Third-Party Facilitator
Technical Working Groups could also choose to use the third-party
facilitator. The third-party facilitator could ensure that all group
Participants had an opportunity to be heard, that the meetings were
productive and efficient, and that meeting summaries were prepared. The
third-party facilitator were selected and paid for by SMUD. However, the
third-party facilitator sought to further the interests of all
Participants, not just the interests of SMUD.
Decision-Making
Participants sought agreement on studies needed, study
methodologies, appropriate PM&E measures, and other issues. Decisions
were made by consensus among the Participants at scheduled Plenary
Group or Technical Working Group meetings. Consensus means that all
Participants to a given decision can "live with" the decision.
Absent specific language to the contrary, the agreements reached by the
Plenary Group or Technical Working Group Participants are not intended to
create contractual obligations. However, the success of this relicensing
depends on all Participants acting in good faith, and it is expected that
when a Participant indicates agreement to a decision, the other
Participants can rely on that Participant to support such decision within
its own organization and throughout the licensing process.
In making decisions and reaching agreements, the Plenary Group or
Technical Working Group Participants used the entire record of
information available, including public input, existing sources of
information and the results of the studies conducted by SMUD.
Dispute Resolution
Participants in the Plenary Group and Technical Working Groups made good faith attempts to reach agreements, as described in
"Decision Making." If consensus regarding a particular issue was
not achieved after reasonable efforts, the issue was considered to be
in dispute. When a Technical Working Group issue was in dispute, the
dispute was referred to the Plenary Group. When the Plenary Group had
an issue in dispute, initial attempts at resolution occurred as internal
focus groups meeting separately, with the facilitator if needed. If
internal forms of dispute resolution failed, the Participants could have arranged
for a FERC facilitator/mediator or a third-party facilitator/mediator, if
the Participants determined that such action would help resolve the
dispute. In disputes on PM&E measures not resolved by the time SMUD submitted its license application to FERC, the
preliminary draft EA prepared by SMUD presented the disputed PM&E
measures in the form of alternative measures.
Technical Working Group meetings were open to the public.
All Meetings were Subject to the
Meeting
Ground Rules/Guidelines
[Top of Page]
|
|