|
Chili Bar
Raw Data, Technical Resource Reports,
& Study Plans
Raw data, technical resource reports & study plans for the
Chili Bar are listed below. Papers
Raw Data
Raw data will be posted as it becomes
available. Technical Resource Reports
These reports were submitted to the FERC on July 15, 2005 as
Appendix I of the PDEA with the UARP Application for New License.
Study Plans
Study Plans will be posted as they become
available.
Aquatic, Water Quality, Geomorphology &
Hydrology Resources Final
Study Plans
Coloma-Camp Lotus Fish Tissue Mercury Analysis Study Plan
Chili Bar Reservoir Incremental Storage Modification Study Plan
Chili Bar Reservoir Sediment Deposition Study Plan
SFAR
Instream Flow and Fluctuation Study Plan
Recreation / Aesthetics Resources TWG Final Study Plans
Chili Bar Reservoir Flatwater Boating Study
Recreational Flow Study
(downstream reach below Chili Bar Dam)
Socioeconomics TWG Final
Study Plans
Chili Bar Socioecomic Study Plan
[Top of Page]
|